Relocation and recommissioning of Eisenmann coating line

This year, we have moved a complete Eisenmann line in the range of 1:1 to a new hall for a manufacturer of luminaries. The implementation included recommissioning of the line and processing of all operating permits.

Project information

CustomerBeghelli-Elplast a.s.
Year of Realization2021
LocationBrno (CZ)
Technology
  • complete disassembly and assembly
  • new electrical installations for pre-treatment, ovens, conveyor, electrical inspection, inspection of the fire extinguishing system
  • safety plastic lining under the tunnel of chemical pre-treatment
  • new burner for the drying oven, including assembly and setting
  • new burner for the curing oven, including assembly and setting    
  • new fittings of pneumatic hoses in painting booths  
  • 2 pcs new plate heat exchangers for degreasing bath

Project description

The coating line was relocated, including chemical pre-treatment with accessories (demi equipment, neutralization station), drying and curing ovens and  both Wagner painting booths. The project included also provision of documentation in the following scope: noise study, dissipation study, expert statement, application for the permit to operate a stationary source of air pollution.