References

Line for coating of aluminium profiles

Good-quality and particularly durable surface treatment plays an essential role in the building industry. And this was the most important factor when deciding about construction of the coating line for RM Aluminium s.r.o., the manufacturer of window and door systems, handrails and other parts of the buildings, in Prievidza.

Project information

CustomerRM Aluminium s.r.o.
Year of Realization2021
LocationPrievidza (SK)
Flow profile300 mm x 1.000 mm x 7.000 mm (w x h x l)
Technology
  • 5-stage immersion pre-treatment,
  • drying oven for AL material,
  • WAP BOX with high pressure cleaning equipment – pre-treatment for Fe,
  • drying oven for Fe material,
  • natural gas curing oven,
  • handling system for pre-treatment, including steel construction,
  • overhead conveyor,
  • plastic coating booth with external extraction 2 pcs hand operated guns,
  • suction wall,
  • automatic fire extinguishing equipment CO2,
  • HiVision® Complex control system.

Project description

To keep high quality of coated aluminium profiles RM Aluminium s.r.o. chose verified chemical technology by ALUFINIISH, the German manufacturer of chemical preparations.

The ENVIROX “NR” system with certified preparation Alficoat 748/3 for Qualicoat and GSB International is implemented in the immersion pre-treatment for aluminium material.

For other materials, primarily for steel constructions, we chose another Alufinish preparation named Ferrophos 7768/3 for iron phosphating in the chamber spray booth.

Handling above immersion pre-treatment baths is provided by the manipulator with possible re-suspension of the hanger with profiles directly to the manual overhead conveyor that links all parts of the technology. After pre-treatment and drying of parts the process continues with manual application of powder paint in plastic booth that makes transfer to another colour easier and faster and reduces the risk of contamination. The fire extinguishing system with flash detection directly in the booth is a matter of course. Painted parts are automatically moved through the booth using automatic transfer. Thus, the operators do not have to move the hangers with products manually and they can fully concentrate on the quality of coating. The process is completed by curing the applied powder paint in a gas-heated furnace and subsequent hanging down of the products.  

Do you like our work? Contact us!

Jindřich Schick

Jindřich Schick

Thermal Paint Stripping

+420 605 205 102schick@itsbrno.cz
Jindřich Schick

Jindřich Schick

Thermal Paint Stripping

+420 605 205 102schick@itsbrno.cz

Show more information - Coating facilities

View product